Rolling Right Along

August 18, 2007

electrical, framing, insulation

Things are really starting to roll now. Thursday, the electrical inspector said that everything looks very good, and that day I installed fiberglass batt insulation and the vapor barrier.

The next day, we rented a sheetrock lift and installed the ceiling drywall. My husband did most of the work– and what a job that was! Our ceilings are over 9 feet high; we were up until 1:30am to finish the job!

I haven’t done too much with the electrical. My arms and hands have been so sore that they are swollen and the veins are showing through! Yuk! The carpal tunnel gets unbearable at times. This explains why I haven’t blogged much, even though I have had lots to blog about. I am taking it easy this week and focusing on getting the Living Room done. My full-time rewiring projects will continue after we finish that.

Yet I did spend a little time today making a new circuit for the washing machine. I’d discovered that the wiring was 14/2 gauge (a lightweight gauge meant for lighting fixtures, not appliances) with a 15 amp outlet. My computers, television, refrigerator, kitchen outlets, porch lights, and DSL modem were all on that same circuit. It took some time to rip out the old washing machine outlet (I dated it to the 1940s, judging by the old powder-blue paint all over it), but snaking it down to the basement and stapling the line to joists and to the circuit breaker panel was a piece of cake. I am very comfortable working in the circuit panel now, and I actually like it! I like to organize, and my panel shows it. I hope the next owners of the house appreciate all my hard work!

The girls have been working on their own projects, too. I showed them how to repair plaster walls with sheetrock. Their bedroom walls have a dozen big holes punched in them, from the electrical work we’ve done in there. They are doing a very good job with the repairs, and becoming quite proficient with the tools.

Things are rolling right along. My husband is going to handle the bulk of the sheetrock installation, which is a big relief for me. He is elated that I will spackle the seams and he won’t have to! I now know why some people hire out the drywall installation… ugh. But for us, this endeavor is 100% sweat equity.